Fusion Post Kit
Setup for a fusion post kit.
  1. Materials needed
    Post Sleeve (designed for use over a treated 4X4 post not included) 1
    Ring Base 1
    Post Cap 1
  2. Measuring
    Cut Ultradeck post sleeve to the proper length. For installation of post caps the post sleeve must be 1" taller than the 4x4 treated post.
  3. Check 4x4 level
    Ensure the 4x4 treated post is plumb and level.
  4. Install sleeve
    Slide post sleeve over the treated 4x4 post. Be sure and slide the ring base to the bottom of the 4x4 before installing any railing spindles. Fasten post sleeves to post when spindles are secured to posts.
  5. Install post cap
    Attach post cap.